{"id":19683,"date":"2021-09-22T00:10:00","date_gmt":"2021-09-22T07:10:00","guid":{"rendered":"https:\/\/copperleaf-test.majortom.dev\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/"},"modified":"2022-12-23T17:12:28","modified_gmt":"2022-12-24T01:12:28","slug":"feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution","status":"publish","type":"post","link":"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/","title":{"rendered":"Feature Article: Optimising National Grid UK Electricity Transmission Assets with the Copperleaf Decision Analytics Solution"},"content":{"rendered":"<p><em>This article originally appeared in the September 2021 newsletter of the <a href=\"https:\/\/www.ifors.org\/\">International Federation of Operational Research Society (IFORS)<\/a>. Composed of 50 national Operational Research (OR) societies, IFORS\u00a0is a network by which OR professionals\u00a0can exchange news, information, and ideas.\u00a0<\/em><\/p>\n<h4>Background <img loading=\"lazy\" decoding=\"async\" class=\"js-loaded size-medium wp-image-31596 alignright\" src=\"https:\/\/copperleaf-test.majortom.dev\/wp-content\/uploads\/2021\/09\/Blog-IFORS-NGET-article-210x300.webp\" alt=\"\" width=\"210\" height=\"300\" srcset=\"https:\/\/copperleaf-test.majortom.dev\/wp-content\/uploads\/2021\/09\/Blog-IFORS-NGET-article-210x300.webp 210w, https:\/\/copperleaf-test.majortom.dev\/wp-content\/uploads\/2021\/09\/Blog-IFORS-NGET-article-450x643.webp 450w, https:\/\/copperleaf-test.majortom.dev\/wp-content\/uploads\/2021\/09\/Blog-IFORS-NGET-article-300x428.webp 300w, https:\/\/copperleaf-test.majortom.dev\/wp-content\/uploads\/2021\/09\/Blog-IFORS-NGET-article-42x60.webp 42w, https:\/\/copperleaf-test.majortom.dev\/wp-content\/uploads\/2021\/09\/Blog-IFORS-NGET-article-161x230.webp 161w, https:\/\/copperleaf-test.majortom.dev\/wp-content\/uploads\/2021\/09\/Blog-IFORS-NGET-article.webp 502w\" sizes=\"(max-width: 210px) 100vw, 210px\" \/><\/h4>\n<p>National Grid Electricity Transmission (NGET) owns and manages the distribution of electricity throughout the UK, which includes in excess of 60,000 assets. These include the familiar towers (pylons) supporting the cables which carry the electricity around the UK, plus associated circuit breakers, instrument transformers, grid transformers, and more. Maintaining the performance of these assets is an investment plan worth between \u00a3800 million and \u00a31 billion a year, so the value of effective optimisation is very high.<\/p>\n<p>Because the assets deteriorate over time, they need to be taken out of service for maintenance and\/or refurbishment at regular intervals. This results in a loss of supply (outage) for the circuit containing that asset, which can be very costly. However it is possible to service more than one asset at the same time in a given circuit, a process called bundling, which will reduce the number of outages and hence the cost incurred.<\/p>\n<p>Every outage comes with an associated direct and indirect cost. Outages must also be carefully coordinated so as not to disrupt the electricity transmission network. For example, it might be determined that out of a set of four circuits, only one may be taken out within a one-year period. Since each intervention also requires resources, such as personnel and spare parts, the planners must schedule these at a time when they are available. So the technical challenge is to find the optimal intervention schedule for each asset in the transmission network, while considering the benefits of bundling gains, the outage costs and resource constraints, plus any relevant business rules.<\/p>\n<p>Copperleaf<sup>\u00ae<\/sup> has its headquarters in Vancouver and provides decision analytics to companies facing the challenges of managing critical infrastructure. Their enterprise software solutions leverage operational, financial and asset data to empower their clients to make investment decisions that deliver the highest business value. This project was carried out by their UK-based team.<\/p>\n<h4>The Solution<\/h4>\n<p>Historically, the planning process had been manual, relying on\u00a0<span class=\"fontstyle0\">a planner using his\/her experience to recognise potential bundling opportunities, then building all the resource and outage requirements together into a deliverable package.<\/span><\/p>\n<p><span class=\"fontstyle0\">However, this approach could not take account of the non-linear calculations involved in estimating outage durations, since each viable solution will result in a different level of outage. This is a disadvantage of the manual approach. NGET and Copperleaf worked together to find improved solutions by combining the power of Copperleaf\u2019s Decision Analytics Solution and its consulting and software development expertise, together with the engineering knowledge and prototypes that had been nurtured within NGET over the years.\u00a0<\/span>The innovative solution enables NGET to run network-wide optimisations involving more than 60,000 assets. These optimisations consider more than 5,000 interventions per year; 50 teams, each with up to five different resource types; and 100 overlapping boundaries for circuit constraint management.<\/p>\n<h4>Implementation<\/h4>\n<p><span class=\"fontstyle0\">Once NGET managers could see the potential benefits from the new optimised solution, they decided to embed it as a central part of their standard asset investment planning process.<\/span><\/p>\n<p><span class=\"fontstyle0\">While the prototype algorithm was developed using Python scripting, NGET made a conscious decision to implement the finished solution using a commercial off-the- shelf software package. The Copperleaf solution integrates asset, maintenance and investment data from existing enterprise systems, thus automating the data input process through eight programmatic integrations s) which run either:<\/span><\/p>\n<ul>\n<li><span class=\"fontstyle0\">nightly (to import updated asset data, for example)<\/span><\/li>\n<li><span class=\"fontstyle0\"><span class=\"fontstyle0\">monthly (to bring in existing investments that are fixed\u00a0<span class=\"fontstyle0\">in the schedule, such as a commitment to connect a new\u00a0<span class=\"fontstyle0\">customer)<\/span><\/span><\/span><\/span><\/li>\n<li><span class=\"fontstyle0\"><span class=\"fontstyle0\"><span class=\"fontstyle0\"><span class=\"fontstyle0\"><span class=\"fontstyle0\">or ad hoc (to update risk model inputs, for example).<\/span><\/span><\/span><\/span><\/span><\/li>\n<\/ul>\n<p><span class=\"fontstyle0\">Monetised risk, asset intervention planning, and circuit optimisation can now be handled together in one simple, centralised platform. Instead of having to work with five different tools or spreadsheets, NGET planners can now find everything they need on a single screen in the Copperleaf solution.\u00a0<\/span>This has also helped to identify long-term resource requirements and pinch points across the network, where NGET needs to recruit and build resource capacity.<\/p>\n<p>Training was provided to distinct teams within NGET to support their individual use cases:<\/p>\n<ul>\n<li><span class=\"fontstyle0\">Enterprise Asset Management Lifecycle Team:\u00a0<span class=\"fontstyle0\"><span class=\"fontstyle0\">Optimise asset replacement plans subject to risk and cost\u00a0<span class=\"fontstyle0\">constrains<\/span><\/span><\/span><\/span><\/li>\n<li><span class=\"fontstyle0\">Network Interventions Team:\u00a0<span class=\"fontstyle0\"><span class=\"fontstyle0\">Optimise full lifecycle asset plans subject to cost, risk, and\u00a0<span class=\"fontstyle0\">planned work<\/span><\/span><\/span><\/span><\/li>\n<li><span class=\"fontstyle0\"><span class=\"fontstyle0\"><span class=\"fontstyle0\"><span class=\"fontstyle0\">Delivery Optimisation Team:\u00a0<span class=\"fontstyle0\"><span class=\"fontstyle0\"><span class=\"fontstyle0\"><span class=\"fontstyle0\"><span class=\"fontstyle0\">Optimise plans subject to team, zone, and national resource\u00a0<span class=\"fontstyle0\">constraints<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/li>\n<li><span class=\"fontstyle0\">Network Optimisation Team:\u00a0<span class=\"fontstyle0\"><span class=\"fontstyle0\">Optimise national plans subject to cost, resource and outage\u00a0<span class=\"fontstyle0\">constraints<\/span><\/span><\/span><\/span><\/li>\n<\/ul>\n<p><span class=\"fontstyle0\">Enhanced asset lifecycle modelling has led to improved risk management, as well as ensuring that NGET selects the right interventions, at the right time, at the right cost for consumers.<\/span><\/p>\n<p>The solution is now managed internally within National Grid with ongoing support provided by Copperleaf which includes membership of the Copperleaf client community and regular product upgrades and releases.<\/p>\n<h4><span class=\"fontstyle2\">Benefits<\/span><\/h4>\n<p><span class=\"fontstyle0\">The new system went live in September 2019 and quickly delivered significant benefits, such as:<\/span><\/p>\n<ul>\n<li><span class=\"fontstyle0\"><span class=\"fontstyle2\"><strong>Centralised Platform<\/strong>: <\/span><span class=\"fontstyle0\">for monetised risk, asset<\/span>\u00a0<span class=\"fontstyle0\">intervention planning and circuit optimisation, now one\u00a0<span class=\"fontstyle0\">screen, instead of having to look at 5 different tools or\u00a0<span class=\"fontstyle0\">spreadsheets.<\/span><\/span><\/span><\/span><\/li>\n<li><strong><span class=\"fontstyle0\">Improved <\/span><\/strong><span class=\"fontstyle2\"><strong>Planning Efficiency<\/strong>: <\/span><span class=\"fontstyle0\">by reducing the time to build\u00a0<span class=\"fontstyle0\">the plan for the fiscal year 2022 by 50% (from 12 weeks to 6\u00a0<span class=\"fontstyle0\">weeks). The increased agility and speed to carry out what-if analysis has been particularly important as NGET had to\u00a0<span class=\"fontstyle0\">deconstruct the initial plan and rebuild it under different\u00a0<span class=\"fontstyle0\">scenarios through the course of the COVID-19 pandemic.<\/span><\/span><\/span><\/span><\/span><\/li>\n<li><span class=\"fontstyle0\"><span class=\"fontstyle0\"><span class=\"fontstyle0\"><span class=\"fontstyle0\"><span class=\"fontstyle0\"><span class=\"fontstyle3\"><strong>Reduction in Outage Costs<\/strong> of \u00a32.5 million per year: <\/span><span class=\"fontstyle0\">The Copperleaf\u00a0<span class=\"fontstyle0\">solution has reduced outage requirements across the network. F<span class=\"fontstyle0\">or example, the number of circuits requiring an outage 3\u00a0<span class=\"fontstyle0\">times in a 5-year period has reduced from 18% to just 8%.\u00a0<span class=\"fontstyle0\">Specifically, compared to manual bundling, Copperleaf&#8217;s optimisation\u00a0<span class=\"fontstyle0\">for the Financial Year 2021 plan has\u00a0<span class=\"fontstyle0\">increased the \u201cBundling Ratio\u201d (number of interventions per\u00a0<span class=\"fontstyle0\">outage) by 66%.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/li>\n<li><span class=\"fontstyle2\"><strong>Higher-value Plans<\/strong>: <\/span><span class=\"fontstyle0\">enhanced asset lifecycle modelling has\u00a0<span class=\"fontstyle0\">led to improved risk management and ensured that National\u00a0<span class=\"fontstyle0\">Grid selects the right interventions at the right time and the\u00a0<span class=\"fontstyle0\">right cost for consumers.<\/span><\/span><\/span><\/span><\/li>\n<li><span class=\"fontstyle2\"><strong>Strategic Workforce Planning<\/strong>: <\/span><span class=\"fontstyle0\">The output from the\u00a0<span class=\"fontstyle0\">Copperleaf optimiser has also provided greater visibility into\u00a0<span class=\"fontstyle0\">long-term resource requirements and pinch-points across\u00a0<span class=\"fontstyle0\">the network where there is a requirement to recruit and build\u00a0<span class=\"fontstyle0\">resource capacity.<\/span><\/span><\/span><\/span><\/span><\/li>\n<\/ul>\n<h4><span class=\"fontstyle2\">Endorsements<\/span><\/h4>\n<p><span class=\"fontstyle4\">\u201cThis is the most complex optimisation problem Copperleaf has ever solved<\/span><span class=\"fontstyle0\">. It recently won the Copperleaf 2020 Innovation Award, voted on by all Copperleaf clients globally.\u201d\u00a0<\/span><br \/>\n\u2014<span class=\"fontstyle0\"> Stan Coleman, Chief Technology Officer, Copperleaf<\/span><\/p>\n<p><span class=\"fontstyle4\">\u201cThe circuit optimisation solution is underpinned by a cutting-edge and complex algorithm that was co-developed with Copperleaf. This is helping NGET further improve our ability to anticipate and manage asset risks, ensuring we continue to make the right investment decisions across our<br \/>\nnetwork.\u201d\u00a0<\/span><br \/>\n<span class=\"fontstyle0\">\u2014 David Wright, Group Chief Engineer, National Grid<\/span><\/p>\n<p><span class=\"fontstyle0\">This project was the runner up in the <a href=\"https:\/\/www.theorsociety.com\/membership\/awards-medals-and-scholarships\/presidents-medal\/\">OR Society\u2019s President\u2019s Medal <\/a>competition in 2020 and won the <a href=\"https:\/\/resources.copperleaf.com\/blog\/wrapping-up-the-iam-virtual-conference\">Innovation Award<\/a> in the Institute of Asset Management (IAM) Global Awards 2020.<\/span><\/p>\n<hr \/>\n<p>Read the full September issue of IFORS <a href=\"https:\/\/www.ifors.org\/newsletter\/ifors-news-sept2021.pdf\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This article originally appeared in the September 2021 newsletter of the International Federation of Operational Research Society (IFORS). Composed of 50 national Operational Research (OR) societies, IFORS\u00a0is a network by which OR professionals\u00a0can exchange news, information, and ideas.\u00a0 Background National Grid Electricity Transmission (NGET) owns and manages the distribution of electricity throughout the UK, which [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":14204,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_searchwp_excluded":"","footnotes":"","_wp_rev_ctl_limit":""},"categories":[71],"industry":[176],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v23.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Feature Article: Optimising National Grid UK Electricity Transmission Assets with the Copperleaf Decision Analytics Solution - Copperleaf<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Feature Article: Optimising National Grid UK Electricity Transmission Assets with the Copperleaf Decision Analytics Solution - Copperleaf\" \/>\n<meta property=\"og:description\" content=\"This article originally appeared in the September 2021 newsletter of the International Federation of Operational Research Society (IFORS). Composed of 50 national Operational Research (OR) societies, IFORS\u00a0is a network by which OR professionals\u00a0can exchange news, information, and ideas.\u00a0 Background National Grid Electricity Transmission (NGET) owns and manages the distribution of electricity throughout the UK, which [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/\" \/>\n<meta property=\"og:site_name\" content=\"Copperleaf\" \/>\n<meta property=\"article:published_time\" content=\"2021-09-22T07:10:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-24T01:12:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/copperleaf-test.majortom.dev\/wp-content\/uploads\/2022\/06\/1920x500_transmissiontower-v1-1.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"alfredo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"alfredo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/\",\"url\":\"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/\",\"name\":\"Feature Article: Optimising National Grid UK Electricity Transmission Assets with the Copperleaf Decision Analytics Solution - Copperleaf\",\"isPartOf\":{\"@id\":\"https:\/\/copperleaf-test.majortom.dev\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/copperleaf-test.majortom.dev\/wp-content\/uploads\/2022\/06\/1920x500_transmissiontower-v1-1.webp\",\"datePublished\":\"2021-09-22T07:10:00+00:00\",\"dateModified\":\"2022-12-24T01:12:28+00:00\",\"author\":{\"@id\":\"https:\/\/copperleaf-test.majortom.dev\/en\/#\/schema\/person\/29040f6a95034ff92693e7e46a0e1f1d\"},\"breadcrumb\":{\"@id\":\"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/#primaryimage\",\"url\":\"https:\/\/copperleaf-test.majortom.dev\/wp-content\/uploads\/2022\/06\/1920x500_transmissiontower-v1-1.webp\",\"contentUrl\":\"https:\/\/copperleaf-test.majortom.dev\/wp-content\/uploads\/2022\/06\/1920x500_transmissiontower-v1-1.webp\",\"width\":1920,\"height\":500,\"caption\":\"Blog Hero Transmission Tower - Copperleaf Decision Analytics\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/copperleaf-test.majortom.dev\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Feature Article: Optimising National Grid UK Electricity Transmission Assets with the Copperleaf Decision Analytics Solution\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/copperleaf-test.majortom.dev\/en\/#website\",\"url\":\"https:\/\/copperleaf-test.majortom.dev\/en\/\",\"name\":\"Copperleaf\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/copperleaf-test.majortom.dev\/en\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/copperleaf-test.majortom.dev\/en\/#\/schema\/person\/29040f6a95034ff92693e7e46a0e1f1d\",\"name\":\"alfredo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/copperleaf-test.majortom.dev\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/332ec8fbf528ede521761fef173613e0?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/332ec8fbf528ede521761fef173613e0?s=96&d=mm&r=g\",\"caption\":\"alfredo\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Feature Article: Optimising National Grid UK Electricity Transmission Assets with the Copperleaf Decision Analytics Solution - Copperleaf","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Feature Article: Optimising National Grid UK Electricity Transmission Assets with the Copperleaf Decision Analytics Solution - Copperleaf","og_description":"This article originally appeared in the September 2021 newsletter of the International Federation of Operational Research Society (IFORS). Composed of 50 national Operational Research (OR) societies, IFORS\u00a0is a network by which OR professionals\u00a0can exchange news, information, and ideas.\u00a0 Background National Grid Electricity Transmission (NGET) owns and manages the distribution of electricity throughout the UK, which [&hellip;]","og_url":"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/","og_site_name":"Copperleaf","article_published_time":"2021-09-22T07:10:00+00:00","article_modified_time":"2022-12-24T01:12:28+00:00","og_image":[{"width":1920,"height":500,"url":"https:\/\/copperleaf-test.majortom.dev\/wp-content\/uploads\/2022\/06\/1920x500_transmissiontower-v1-1.webp","type":"image\/webp"}],"author":"alfredo","twitter_card":"summary_large_image","twitter_misc":{"Written by":"alfredo","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/","url":"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/","name":"Feature Article: Optimising National Grid UK Electricity Transmission Assets with the Copperleaf Decision Analytics Solution - Copperleaf","isPartOf":{"@id":"https:\/\/copperleaf-test.majortom.dev\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/#primaryimage"},"image":{"@id":"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/#primaryimage"},"thumbnailUrl":"https:\/\/copperleaf-test.majortom.dev\/wp-content\/uploads\/2022\/06\/1920x500_transmissiontower-v1-1.webp","datePublished":"2021-09-22T07:10:00+00:00","dateModified":"2022-12-24T01:12:28+00:00","author":{"@id":"https:\/\/copperleaf-test.majortom.dev\/en\/#\/schema\/person\/29040f6a95034ff92693e7e46a0e1f1d"},"breadcrumb":{"@id":"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/#primaryimage","url":"https:\/\/copperleaf-test.majortom.dev\/wp-content\/uploads\/2022\/06\/1920x500_transmissiontower-v1-1.webp","contentUrl":"https:\/\/copperleaf-test.majortom.dev\/wp-content\/uploads\/2022\/06\/1920x500_transmissiontower-v1-1.webp","width":1920,"height":500,"caption":"Blog Hero Transmission Tower - Copperleaf Decision Analytics"},{"@type":"BreadcrumbList","@id":"https:\/\/copperleaf-test.majortom.dev\/en\/blog\/feature-article-optimising-national-grid-uk-electricity-transmission-assets-with-the-copperleaf-decision-analytics-solution\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/copperleaf-test.majortom.dev\/en\/"},{"@type":"ListItem","position":2,"name":"Feature Article: Optimising National Grid UK Electricity Transmission Assets with the Copperleaf Decision Analytics Solution"}]},{"@type":"WebSite","@id":"https:\/\/copperleaf-test.majortom.dev\/en\/#website","url":"https:\/\/copperleaf-test.majortom.dev\/en\/","name":"Copperleaf","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/copperleaf-test.majortom.dev\/en\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/copperleaf-test.majortom.dev\/en\/#\/schema\/person\/29040f6a95034ff92693e7e46a0e1f1d","name":"alfredo","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/copperleaf-test.majortom.dev\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/332ec8fbf528ede521761fef173613e0?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/332ec8fbf528ede521761fef173613e0?s=96&d=mm&r=g","caption":"alfredo"}}]}},"_links":{"self":[{"href":"https:\/\/copperleaf-test.majortom.dev\/en\/wp-json\/wp\/v2\/posts\/19683"}],"collection":[{"href":"https:\/\/copperleaf-test.majortom.dev\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copperleaf-test.majortom.dev\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copperleaf-test.majortom.dev\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/copperleaf-test.majortom.dev\/en\/wp-json\/wp\/v2\/comments?post=19683"}],"version-history":[{"count":0,"href":"https:\/\/copperleaf-test.majortom.dev\/en\/wp-json\/wp\/v2\/posts\/19683\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/copperleaf-test.majortom.dev\/en\/wp-json\/wp\/v2\/media\/14204"}],"wp:attachment":[{"href":"https:\/\/copperleaf-test.majortom.dev\/en\/wp-json\/wp\/v2\/media?parent=19683"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copperleaf-test.majortom.dev\/en\/wp-json\/wp\/v2\/categories?post=19683"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/copperleaf-test.majortom.dev\/en\/wp-json\/wp\/v2\/industry?post=19683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}